S-21LS Shizuoka Omaezaki
Total Module Output |
1,098.24kW |
Number of Installed Modules |
4,224 |
Total Output |
990kW |
FIT Price |
36JPY/kWh |
End of FIT |
March 29, 2035 |
Interconnection |
Chubu Electric Power |
Annual Energy Production on First Operating Year (Expected) |
1,387.87MWh |
Availability Factor on First Operating Year (expected) |
14.43% |
Operator |
Takara Leben |
EPC |
NEO |
Manufacture of Module |
Shanghai JA Solar Technology |
Supplier of Power Conditioner |
MEIDENSHA |
O&M Provider |
Energy O&M.Inc |
Land Area |
18,992㎡ |
Land Rights |
Ownership |
Type of Module |
Polycrystalline Silicon |
|
|
|
|
|
|
|
|
Total Module Output |
1,098.24kW |
Number of Installed Modules |
4,224 |
Total Output |
990kW |
FIT Price |
36JPY/kWh |
End of FIT |
March 29, 2035 |
Interconnection |
Chubu Electric Power |
Annual Energy Production on First Operating Year (expected) |
1,387.87MWh |
Availability Factor on First Operating Year (expected) |
14.43% |
Operator |
Takara Leben |
EPC |
NEO |
Panel Manufacturer |
Shanghai JA Solar Technology |
PCS Manufacturer |
MEIDENSHA |
O&M Provider |
NEO |
Land Area |
18,992㎡ |
Ownership |
Superficies |
Type of Module |
Polycrystalline Silicon |