Total Module Output 1,098.24kW
Number of Installed Modules 4,224
Total Output 990kW
FIT Price 36JPY/kWh
End of FIT March 29, 2035
Interconnection Chubu Electric Power
Annual Energy Production on First Operating Year (Expected) 1,387.87MWh
Availability Factor on First Operating Year (expected) 14.43%
Operator Takara Leben
EPC NEO
Manufacture of Module Shanghai JA Solar Technology
Supplier of Power Conditioner MEIDENSHA
O&M Provider Energy O&M.Inc
Land Area 18,992㎡
Land Rights Ownership
Type of Module Polycrystalline Silicon
Total Module Output 1,098.24kW Number of Installed Modules 4,224 Total Output 990kW FIT Price 36JPY/kWh
End of FIT March 29, 2035 Interconnection Chubu Electric Power Annual Energy Production on First Operating Year (expected) 1,387.87MWh Availability Factor on First Operating Year (expected) 14.43%
Operator Takara Leben EPC NEO Panel Manufacturer Shanghai JA Solar Technology PCS Manufacturer MEIDENSHA
O&M Provider NEO Land Area 18,992㎡ Ownership Superficies Type of Module Polycrystalline Silicon