S-19LS Sakuragawa Shimoizumi


Total Module Output 2,535.04kW
Number of Installed Modules 14,912
Total Output 1,980.00kW
FIT Price 36JPY/kWh
End of FIT July 27, 2036
Interconnection TEPCO
Annual Energy Production on First Operating Year (expected) 3,167.88MWh
Availability Factor on First Operating Year (expected) 14.27%
Operator Takara Leben
EPC Edison Power
Manufacture of Module Solar Frontier
Supplier of Power Conditioner Fuji Electric
O&M Provider Hitachi Zosen, TOYO BLDG MAINTENANCE
Land Area 47,193㎡
Land Rights Superficies
Type of Module CIS
Total Module Output 2,535.04kW Number of Installed Modules 14,912 Total Output 1,980.00kW FIT Price 36JPY/kWh
End of FIT July 27, 2036 Interconnection TEPCO Annual Energy Production on First Operating Year (expected) 3,167.88MWh Availability Factor on First Operating Year (expected) 14.27%
Operator Takara Leben EPC Edison Power Manufacture of Module Solar Frontier Supplier of Power Conditioner Fuji Electric
Hitachi Zosen, TOYO BLDG MAINTENANCE TOYO BLDG MAINTENANCE Land Area 47,193㎡ Land Rights Superficies Type of Module CIS