S-35LS Fukushima Kagamiishi 2
Total Module Output |
712.32KW |
Number of Installed Modules |
2,688 |
Total Output |
500.00KW |
FIT Price |
27 JPY/kWh |
End of FIT |
March 23, 2037 |
Interconnection |
Tohoku Electric Power Co.,Inc. |
Annual Energy Production on First Operating Year (Expected) |
806.28MWh |
Availability Factor on First Operating Year (expected) |
12.92% |
Operator |
Takara Leben |
EPC |
FUKUSHO K.K. |
Panel Manufacturer |
JA Solar K.K. |
PCS Manufacturer |
Nissin Electric Co., Ltd. |
O&M Provider |
Energy O&M Inc. |
Land Area |
9,187㎡ |
Land Rights |
Surface rights |
Type of Module |
Polycrystal silicon |
|
|
|
|
|
|
|
|
Total Module Output |
712.32KW |
Number of Installed Modules |
2,688 |
Total Output |
500.00KW |
FIT Price |
27 JPY/kWh |
End of FIT |
March 23, 2037 |
Interconnection |
Tohoku Electric Power Co.,Inc. |
Annual Energy Production on First Operating Year (expected) |
806.28MWh |
Availability Factor on First Operating Year (expected) |
12.92% |
Operator |
Takara Leben |
EPC |
FUKUSHO K.K. |
Panel Manufacturer |
JA Solar K.K. |
Supplier of Power Conditioner |
Nissin Electric Co., Ltd. |
O&M Provider |
Energy O&M Inc. |
Land Area |
9,187㎡ |
Land Rights |
Surface rights |
Type of Module |
Polycrystal silicon |