S-12LS Tsukuba Bouchi


Total Module Output 2,469.60kW
Number of Installed Modules 10,080
Total Output 1,990.00kW
FIT Price 40JPY/kWh
End of FIT July 13, 2034
Interconnection TEPCO
Annual Energy Production on First Operating Year (expected) 2,952.86MWh
Availability Factor on First Operating Year (expected) 13.65%
Operator Takara Leben
EPC SHARP
Manufacture of Module SHARP
Supplier of Power Conditioner Fuji Electric
O&M Provider TOYO BLDG MAINTENANCE
Land Area 33,250.95㎡
Land Rights Lease (incl. sublease)
Type of Module Polycrystalline Silicon
Total Module Output 2,469.60kW Number of Installed Modules 10,080 Total Output 1,990.00kW FIT Price 40JPY/kWh
End of FIT July 13, 2034 Interconnection TEPCO Annual Energy Production on First Operating Year (expected) 2,952.86MWh Availability Factor on First Operating Year (expected) 13.65%
Operator Takara Leben EPC SHARP Manufacture of Module SHARP Supplier of Power Conditioner Fuji Electric
O&M Provider TOYO BLDG MAINTENANCE Land Area 33,250.95㎡ Land Rights Lease (incl. sublease) Type of Module Polycrystalline Silicon