S-16LS Inashiki Aranuma1


Total Module Output 2,725.68kW
Number of Installed Modules 10,872
Total Output 1,990.00kW
FIT Price 36JPY/kWh
End of FIT July 27, 2036
Interconnection TEPCO
Annual Energy Production on First Operating Year (expected) 3,246.43MWh
Availability Factor on First Operating Year (expected) 13.98%
Operator Takara Leben
EPC SHARP
Manufacture of Module SHARP
Supplier of Power Conditioner Fuji Electric
O&M Provider TOYO BLDG MAINTENANCE
Land Area 32,556.00㎡
Land Rights Superficies
Type of Module Polycrystalline Silicon
Total Module Output 2,725.68kW Number of Installed Modules 10,872 Total Output 1,990.00kW FIT Price 36JPY/kWh
End of FIT July 27, 2036 Interconnection TEPCO Annual Energy Production on First Operating Year (expected) 3,246.43MWh Availability Factor on First Operating Year (expected) 13.98%
Operator Takara Leben EPC SHARP Manufacture of Module SHARP Supplier of Power Conditioner Fuji Electric
O&M Provider TOYO BLDG MAINTENANCE Land Area 32,556.00㎡ Land Rights Superficies Type of Module Polycrystalline Silicon